Discovery and dependency map
Servers, databases, jobs and integrations catalogued.
Modernise on-premise software without a big-bang rewrite.
ERPHUBs moves legacy desktop and on-premise applications to cloud architectures using rehost, replatform or refactor strategies chosen by risk, cost and business value.
Legacy applications on old servers are costly to maintain, hard to secure and slow to change. Cloud migration restores agility, but only if dependencies, data and performance are understood first. We plan, rehost or refactor, and cut over with a rollback path.
ERPHUBs moves legacy desktop and on-premise applications to cloud architectures using rehost, replatform or refactor strategies chosen by risk, cost and business value.
Discuss your projectEach deliverable is scoped, reviewed with you and handed over with documentation.
Servers, databases, jobs and integrations catalogued.
Rehost, replatform, refactor or retire, chosen by value and risk.
Accounts, networks, identity and encryption ready before moves.
Bulk plus continuous replication to minimise downtime.
Right-sizing and budgets after cut-over.
Safe shutdown and archiving of the old environment.
The bottleneck. Servers and licences are costly and risky.
How we design it. Cloud hosting with managed services and backups.
Target result: 0 data loss target
The bottleneck. Nobody understands the old system.
How we design it. Incremental refactoring behind stable APIs.
Target result: Minutes typical cut-over downtime
The bottleneck. Staff cannot work off-site.
How we design it. Web-based access with SSO and MFA.
Target result: 100% feature parity checked
Every sector hits different walls. Here is what we see and how we design around it.
Bottleneck: Plant software runs on old servers.
Our design: Hybrid design keeping shop-floor connectivity.
Bottleneck: Compliance blocks big changes.
Our design: Phased moves with audit evidence.
Bottleneck: Campus systems are on-premise.
Our design: Cloud portals while core systems migrate.
Bottleneck: Branches share a central server.
Our design: Cloud ERP access across locations.
Migrations fail in predictable ways. We plan for each one before the first record moves.
The risk. Records are altered or dropped during transfer.
Our safeguard. Checksums, record counts and sampled comparisons at every trial load.
The risk. Users locked out during the switch.
Our safeguard. Continuous replication and a rehearsed, time-boxed cut-over.
The risk. Behaviour differs from the old app.
Our safeguard. Automated regression suite and side-by-side user acceptance tests.
The risk. Store changes reset ratings or break updates.
Our safeguard. Same bundle IDs, transfer-safe processes and staged rollouts.
The risk. New environment is configured loosely.
Our safeguard. Hardened landing zone, secrets management and access reviews.
The risk. Cloud or licence costs exceed forecasts.
Our safeguard. Right-sizing, budgets and alerts from the first week.
Nothing goes live on trust. Each item below is checked, recorded and signed off with you before cut-over.
Counts, checksums and samples compared between old and new.
At least one full dress rehearsal before go-live.
Encrypted transfer, access control and audit logs.
Accounts, sessions and settings carried across.
Typically 4 to 16 weeks depending on size, data volume and downtime limits.
Older, larger systems need deeper discovery.
Large datasets need staged or replicated loads.
Zero-downtime plans add engineering effort.
Every library and integration must be replaced or re-tested.
A clear scope, timeline and price for well-defined work.
A named squad that works as part of your team month to month.
Ongoing fixes, updates and monitoring after launch.
Typical situations where clients bring us in, and what we design for each.
Move to cloud with a lift, refactor or rebuild plan chosen per module.
Let branches, field staff and partners use the system securely from anywhere.
Replace tape and ad-hoc copies with tested restore and disaster plans.
Right-size cloud spend with monitoring and budgets from day one.
Code, data and dependency scans that size the work before quoting.
Scripted extraction, mapping and validation with repeatable dry runs.
Old and new systems tested against the same cases and datasets.
Freeze windows, rollback plans and live monitoring on go-live day.
We agree measurable targets up front and report against them.
Record counts and balances matched between old and new systems.
Planned cut-over windows measured in minutes where possible.
Open critical issues at day 7 and day 30.
Logins and task completion compared with the old system.
Dry runs and reconciliation reports prove nothing is lost before cut-over.
We plan the shortest safe window and rehearse it.
A tested rollback path is part of every migration plan.
Yes, including bundle IDs, certificates and compliance forms.
Uptime, errors and performance watched, with fixes under agreed response times.
Dependencies, platforms and security patches kept current.
A monthly pool of hours for improvements, prioritised with you.
Documentation, recordings and sessions so your team stays independent.
Connected by ERPHUBs, a Zoho Authorized Partner.
See howYes, plus managed hosting where suitable.
We plan rehearsed cutovers with rollback and minimal downtime.
Often yes; we compare rebuild, replace and migrate options.
Cost depends on scope, integrations, compliance needs and the number of users or pages. After a short discovery we give a fixed or phased quote with clear milestones, so you can compare it with other options.
Typically 4 to 16 weeks depending on size, data volume and downtime limits.
We offer support retainers covering fixes, updates, monitoring and enhancements, plus a handover with documentation and training so your team is never locked in.
Share your goal and constraints. A senior consultant replies with questions, options and a scoped quote.
Moving to Zoho from another system in Singapore means mapping tax codes, currency and opening balances correctly the first time, then switching over between filing deadlines.
We avoid the busy filing windows: Within 3 months of year end: Estimated Chargeable Income (ECI); 30 November: Corporate income tax return (Form C-S / C).
Existing tax codes are matched to GST (9% standard) in the Zoho Books Singapore edition (GST).
Your Zoho account is created on the Nearest regional data centre (confirmed at signup) (zoho.com).
Typical sources in Singapore: Xero, QuickBooks, Sage, Excel.
Yes. The Singapore team configures it with the Zoho Books Singapore edition (GST), SGD and GST, and supports it Mon-Fri 09:00-18:00 SGT.
Zoho accounts for Singapore use the Nearest regional data centre (confirmed at signup) (zoho.com). We confirm the data centre with you before any migration or integration starts.
Loading the booking calendar…
A certified Zoho consultant will reply with a tailored quote. Or call +1(650) 360-1358.