Redesign Development
Redesign for performance, usability and compliance.
Website redesign, UI/UX redesign, Core Web Vitals optimisation and WCAG accessibility compliance.
Look, feel, speed, access
Proof of improvement
Inclusive by design
Why Redesign Needs a Specialist Approach
Redesign services at ERPHUBs include full website redesign, UI/UX redesign, Core Web Vitals optimisation and WCAG 2.2 accessibility remediation, with SEO protection throughout.
Website redesign, UI/UX redesign, Core Web Vitals optimisation and WCAG accessibility compliance.
Discuss your projectWhat Stalls Redesign Projects, and How We Design the Fix
Aging design
The bottleneck. Looks dated, converts poorly.
How we design it. Research-led modern design.
Target result: +25% typical lead uplift goal
Poor vitals
The bottleneck. Slow LCP, INP and CLS.
How we design it. Targeted engineering fixes.
Target result: LCP 2.5s Core Web Vitals target
Accessibility gaps
The bottleneck. Some users are excluded.
How we design it. Audit and remediation to WCAG 2.2.
Target result: WCAG 2.2 AA accessibility goal
SEO risk
The bottleneck. Redesigns drop traffic.
How we design it. Redirects and metadata preserved.
Target result: 0 lost key URLs
A Five-Step Delivery Path
- 1AuditAnalytics, usability and technical review.
- 2StrategyGoals, KPIs and URL preservation.
- 3RedesignPrototype, test and build.
- 4LaunchRedirects and metadata verified.
- 5MeasureBefore-and-after reporting.
Quality, Security and Compliance in Redesign
Evidence-led decisions
Analytics, recordings and tests guide design.
SEO protection
URL, content and metadata preserved.
Accessibility by design
Contrast, focus and semantics from the start.
Measured outcomes
Before-and-after reporting against agreed KPIs.
What Affects Timeline and Cost in Redesign
Usually 6 to 14 weeks including research, design and build.
Page count
More templates and pages extend design and QA.
Research depth
Interviews and testing add time and insight.
Platform change
Replatforming adds migration work.
Content updates
Rewriting copy is often the longest step.
Ways to Work With ERPHUBs
Fixed-scope project
A clear scope, timeline and price for well-defined work.
Dedicated team
A named squad that works as part of your team month to month.
Support retainer
Ongoing fixes, updates and monitoring after launch.
How We Build Redesign
Research tools
Analytics, heatmaps, recordings and user interviews.
Design and prototyping
Figma design systems and clickable prototypes for testing.
Audit tooling
Lighthouse, PageSpeed, axe and manual screen reader checks.
Build and QA
Responsive builds with cross-browser and device testing.
How We Measure Redesign Results
We agree measurable targets up front and report against them.
Before and after speed
Core Web Vitals compared on the same pages.
Conversion lift
Enquiries or sales per visit measured across the change.
Accessibility score
Automated and manual issues closed and verified.
Task success
Usability tests showing users finish key tasks faster.
Questions to Settle Before Starting Redesign
Will we lose our rankings?
We protect them with a content audit, URL map and redirect plan.
How do you decide what to change?
Analytics, user research and tests guide the changes, not taste.
Can we redesign in phases?
Yes. Start with the highest-impact pages and expand.
How do you prove it worked?
Before and after metrics on speed, conversion and accessibility.
Support, Maintenance and Handover
Monitoring and fixes
Uptime, errors and performance watched, with fixes under agreed response times.
Updates and security
Dependencies, platforms and security patches kept current.
Enhancements
A monthly pool of hours for improvements, prioritised with you.
Training and handover
Documentation, recordings and sessions so your team stays independent.
Connected to the Zoho Apps You Already Use
Redesign, Answered
Will redesign hurt SEO?
Not when URLs, content and redirects are handled correctly.
Can you only fix speed?
Yes, performance work can be done on its own.
Do you audit accessibility?
Yes, with a prioritised remediation report.
How much does Redesign development cost?
Cost depends on scope, integrations, compliance needs and the number of users or pages. After a short discovery we give a fixed or phased quote with clear milestones, so you can compare it with other options.
How long does Redesign development take?
Usually 6 to 14 weeks including research, design and build.
What support do you provide after Redesign development goes live?
We offer support retainers covering fixes, updates, monitoring and enhancements, plus a handover with documentation and training so your team is never locked in.
Tell us about your Redesign project
Share your goal and constraints. A senior consultant replies with questions, options and a scoped quote.
Talk to a certified Zoho expert
Share your details and an expert will call you, usually within working hours the same day.
- Free, no-obligation consultation
- Certified Zoho ERP & CRM professionals
- India, UAE & USA coverage
Request a Call Back
Fill in the form and we’ll get back to you shortly.
Thank you!
We’ve received your request. A certified Zoho consultant will call you shortly.